Many building owners are suspicious of energy performance contractors because the performance contractor is both a player and a score keeper. Because a significant effort is required to understand the information in building systems, there are significant start-up costs. These costs, both in money and time, require that each contract include a significant minimum contract lengths over which to amortize the up-front costs. These up-front costs make it uneconomical for energy contracting to use a third party auditor to verify results.If the owner selects a new a new performance contractor, the up-front costs will be incurred again.
Read More
Engineering information is document oriented. Large documents, even sheaths of documents, are exchanged, specifying in great detail exactly what to do, and how to do it. Modern IT (Information Technology) is based on Services. Service exchanges are minimal, as small as can specify results, and do not specify the means of execution at all. For the last 50 years, IT has moved far faster than have engineered system, the things we can touch, inhabit, or ride around in. For the next 50 years, when engineered systems will need to evolve as fast as IT has for the last 50, we will need a middle ground, between document and service call. This is the challenge of configuration, shared configuration that will enable big systems to interact as nimbly as does IT does today....
Read More