Angered and motivated by my experience preparing a large state university for Y2K, I made my public entrance to the public building systems space in 2002. Y2K was a crisis when it was anticipated that any program that used a two-digit year in the date (as in 99, and it was all of them) would fail after the year 2000 (when the year might be 01). State universities build using low bidders in accord with state construction law, and the University of North Carolina had accumulated a hodge-podge of systems for building operations, steam distribution, chill water distribution, cogeneration, and electricity purchases that barely interoperated. Worse still, the interoperations were fragile, and upgrading any one system would break the connections with any number of other systems. I simply wanted stable inter-system connections that did not break with any minor change to either system.
Read MoreIntegration
The Great IoT Roll-Out
Today, is the largest roll-out of an open platform for the Internet of Things ever. So you have to be thinking, “How does this change my plans”
Today, millions of users are installing a securable open source IoT Platform. Users of Windows 7, Windows 8, and Windows 8.1 are eligible for free upgrade to Windows 10. Windows 10 includes an AllJoyn server as a core service.
The developers of digital controls in buildings have long been pioneers in the Internet of Things (IoT)...
Smart Energy with a little bit of Seoul.
My visit to Seoul this month was fascinating. The country of Korea built its infrastructure essentially from scratch in the last 50 years, and in doing so was able to use modern technology to challenge some fundamental assumptions that we make in the USA. IP-based telephony predominates based on pervasive free Wi-Fi. Custom tailors use radical outsourcing mediated by IT to provide near-instant services. The National Virtual Power Plant (NVPP) is as up-to-date as any, while using big-data tools in ways not often seen here. There is a desire to embrace the new without fear that seems young and fresh in the way the US often does not. But somehow, the single observation that stays with me is how the use of IT to challenges our assumptions about natural monopolies....
Read MoreCommercial Use of Live Energy Models
Many building owners are suspicious of energy performance contractors because the performance contractor is both a player and a score keeper. Because a significant effort is required to understand the information in building systems, there are significant start-up costs. These costs, both in money and time, require that each contract include a significant minimum contract lengths over which to amortize the up-front costs. These up-front costs make it uneconomical for energy contracting to use a third party auditor to verify results.If the owner selects a new a new performance contractor, the up-front costs will be incurred again.
Read More