Smart energy names the techniques and technologies needed to manage energy flows and energy supply and demand when energy generation and energy storage are as distributed as energy consumption is today. Grid assets are managed by central control. This only works so long as the assets are central and the assets are centrally owned. Distributed assets should have distributed ownership. We must turn the centralized model on its head. Smart energy manages from the edges, not from the center. Smart energy treats homes and commercial buildings as microgrids responsible for their own power.
Read MoreConstruction
Slim BIM: The Middle Ground between Document and Service Part 2
In my last post, introduced Slim BIM and the critical need for shared configuration to speed development in the building systems. This post extends that conversation.
A report from NREL, delivered last Spring, defined the Building Service Interface (BSI), a standard for interacting with building systems from non-building applications. That report recommended that each BSI be able to share a light-weight BIM, i.e., ...
Slim BIM: The Middle Ground between Document and Service Part 1
Engineering information is document oriented. Large documents, even sheaths of documents, are exchanged, specifying in great detail exactly what to do, and how to do it. Modern IT (Information Technology) is based on Services. Service exchanges are minimal, as small as can specify results, and do not specify the means of execution at all. For the last 50 years, IT has moved far faster than have engineered system, the things we can touch, inhabit, or ride around in. For the next 50 years, when engineered systems will need to evolve as fast as IT has for the last 50, we will need a middle ground, between document and service call. This is the challenge of configuration, shared configuration that will enable big systems to interact as nimbly as does IT does today....
Read MoreOperational BIM Schedules and Pre-Design Programming
Facility Programming is an important early step in step in the Integrated Design Process. Programming is defined in the Whole Building Design Guidelines (WBDG) as “the research and decision-making process that identifies the scope of work to be designed.” Programming is the first part of the design cycle, during which systems and space requirements are identified by the activities they will support. If the design process is compliant with the formal BIM process (BuildingSmart, NBIMS, etc.), then these systems and spaces are identified as described in the IFCs.
BIM is a collection of information sets and models with identified interfaces / information exchanges between them. A model that is of growing interest is the building’s energy model, which is today derived from...